portfolio_page-template-default,single,single-portfolio_page,postid-1512,ajax_fade,page_not_loaded,,qode-title-hidden,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-13.5,qode-theme-bridge,disabled_footer_bottom,wpb-js-composer js-comp-ver-8.0.1,vc_responsive

Lehigh Valley International Airport

Security Checkpoint/Terminal Connector Project
RS&H

Volume: $31.8 Million
Size:  20,000 SQ FT

 

Since 1974, an underground tunnel has been the direct connection for passengers between the Main Terminal and Departure Building at Lehigh Valley International Airport (ABE).

 

THAT EXISTING TRAVEL ROUTE IS ABOUT TO CHANGE:

 

In May 2021, the Lehigh-Northampton Airport Authority (LNAA) joined federal, state, and local officials along with regional organizations to celebrate the takeoff of the Security Checkpoint/Terminal Connect Project.

 

Security Checkpoint/Terminal Connector Project Breakdown:

  • 4-lane security checkpoint with latest-generation screening equipment provided by TSA
  • New Vertical Circulation equipment with redundancy to enhance ADA compliance
  • Enhanced air purification system and improved air circulation
  • Separation of outbound and inbound passenger flow

 

While the pandemic impacted aviation across the world, ABE has already returned to pre-pandemic passenger traffic levels which heightens the priority of completing this project and the need for additional security screening lanes.

Projection Completion is in 2023