• IMG 6018 01homepage
  • 170928 421
  • IMG 6135hp
  • NissanHP
  • LevittPavHomePage
  • Washingtonelementary2
  • HanoverTownshipHomePage
  • American-Bank-1
  • LVH Emergency
  • Allentown Parking Authority | Community Parking Deck | Allentown PA
  • Catasauqua Municipal Building | Catasauqua PA
  • Hazleton Honda Dealership | Hazleton PA
  • Hazleton Nissan Dealership | Hazleton PA
  • Levitt Pavilion SteelStacks | Bethlehem PA
  • Bangor Area School District | Washington Elementary School | Bangor PA
  • Hanover Township Administration & Public Works Facility | Allentown PA
  • Jaindl Building | American Bank | Allentown PA
  • Lehigh Valley Hospital | Emergency Department Addition | Allentown PA
LVH Emergency

Lehigh Valley Hospital

Emergency Department Addition | Allentown, PA

Lehigh Valley Hospital has earned the reputation of being the premier Hospital in the Lehigh Valley. When the need arose for the expansion of the Emergency Department, Lehigh Valley Hospital was quick to address that need. Lehigh Valley Hospital hired Bracy Contracting to complete the $3,200,000, multi-phased renovations and new addition because of Bracy’s extensive experience with multi-phased hospital projects.

The Emergency Department needed to be kept in full service during the 8 months of construction. Bracy prepared a detailed schedule indicating not only Bracy’s construction work but also Owner tasks that need to be completed. One of the major construction challenges was the connections to storm piping, which was twenty feet below the existing grade and directly adjacent to the existing building foundations. Extensive shoring and precise excavation work was need to complete the tie-ins. Also, because of the poor soil bearing pressure, approximately 100 mini piles needed to be installed prior to starting the concrete foundations.

The project consisted of a new one story addition that contained a lobby and waiting areas. The walk-in entrance was relocated as well as the ambulance entrance. New triage areas, administrative areas, and toilet rooms were also installed. The parking areas and roadways were changed to accommodate the new addition and ambulance entrance.